In early 2019, Allshelter was engaged to come up with a solution for creating an on-site pre-cast facility, to assist with the Batemans Bay bridge eplacement project. The shelter was installed and in use by mid 2019.
Get a FREE Quote
Enquire using the form below and your shelter specialist will be in touch.