Project Install Time: 8 Weeks on Shelters, 12- 14 Weeks On Containers
Location: Yalgoo, WA
Shelter Size: 715m²
Purpose: Multifunctional Workshop Setup for Heavy Vehicles & Light Vehicles, and Dedicated Electrical Maintenance Area
Structure Type: Container-Mounted Fabric Shelter
29Metals is focused on mining copper and precious metals with a deep commitment to safety and sustainability. Their Golden Grove site in WA is world-class, carrying a proud legacy that started with the discovery of the Gossan Hill deposit back in 1971. Over the decades, the site has grown from the Scuddles underground mine in the late ’80s to massive open-pit operations today. It’s a 24/7, high-intensity environment that requires a serious, reliable infrastructure to support its high-output, continuous operations.
The Project Brief
To support their growing operations at Golden Grove, 29Metals needed a massive, multi-functional workshop setup. It requires an adequate space to easily service heavy mining equipment and light vehicles, while leaving plenty of room for a dedicated electrical maintenance area. Because of the demanding environment and rapid growth of the mining operation, they needed an engineered solution that was compliant, durable, and ready to deploy fast.
They reached out to Allshelter for a complete turnkey package of container-mounted fabric shelters. The challenge was not just meeting the requested technical specifications; Allshelter has demonstrated agile engineering expertise and the collaborative support required to successfully execute a complex, multi-structure installation on a tight timeline.
Our Shelter Solution
Allshelter engineered and delivered a comprehensive, integrated workshop complex tailored to the heavy demands of the Gossan Valley site. The complete turnkey solution featured a combination of high-capacity fabric structures, modified containers, and operational essentials:
- 2 Shipping Container Mounted Shelters measuring 12.2m wide × 14.5m long × 6.2m high – Wind Region A, TC2, Importance Level 2
- 1 Shipping Container Mounted Shelter measuring 12.2m wide x 26.83m long x 6.2m high – Wind Region A, TC2, Importance Level 2
- 1 High Voltage Room Shipping Container with 2 PA Doors, Insulation, Lights, J-Box, AC Isolators, Plumbing Sink, Hot Water Urn, and HWS 50L
- 1 Lunch Room Shipping Container with 2 PA Doors, Insulation, Heavy Duty Vinyl Floors, 2 Split-type Air Conditioners, Lights, Smoke Detector, and a Hard-Wired J Box
- 1 Hydraulic Hose Shipping Container with 1 PA Door, Insulation, 1 Split-type Aircon, Panel Partition Wall, Lights, and Smoke Detector
- 4 Storage Room Shipping Container with heavy-duty 2m height x 2m width Roller Door
- 1 Dangerous Goods Shipping Container with Intrisic Lighting (spark-free)
- 3 Partial Endwalls for weather proofing
- Tropical Roof & Box Gutters with Downpipes for heavy-duty rain proofing
- A light set to ensure 24/7 operational safety and visibility.
- A professional off-grid fabric shelter installation consisting of 14 weeks on container modifications and an efficient 8-week on-site shelter installation.
Why Allshelter?
Securing this project came down to relentless teamwork and staying agile right from the start. Our sales team knew the stakes were high, so they hit all the marks to match the client’s timeline immediately. It took months of collaboration, but our engineering and sales teams stayed locked in with 29Metals to refine the scope, tackle site-specific challenges, and get the configuration exactly right. That deep commitment to the consulting phase, paired with our knack for delivering fully integrated, container-modified setups, is exactly how we turned a massive technical challenge into a winning result for Golden Grove’s Allshelter infrastructure.